Your savings plan
Your projection
Required monthly deposit
First projected funded date:
View the dated deposit schedule
| Date | Deposit | Interval interest | Balance |
|---|
How this calculator works
The required deposit is the gap between your target and the future value of your existing savings, divided by the combined future-value factors of the eligible monthly deposit dates. The amount is rounded up to the next cent and then projected on the same dates.
Deposit = max(0, [target − starting savings × growth factor] / sum of deposit growth factors)
When existing savings and projected interest already cover the target, the required deposit is $0. If the deadline falls before the first deposit and growth is insufficient, the result is unavailable under that schedule. Moving the first deposit or deadline changes the available plan.
Worked example
Start with $6,000, target $18,000 and earn 0% APY. Twelve monthly deposits of $1,000 on or before the deadline reach $18,000. If only eleven eligible dates remain, the required monthly amount rounds up to $1,090.91.
Calendar and interest assumptions
Interest accrues between dates at the effective-equivalent daily rate (1 + APY)1/365 − 1, using actual days divided by 365, including leap years. Deposits are added after interest through their date, then begin earning interest for subsequent days. A deposit on the start date is allowed. The original first-deposit date anchors every anniversary: January 31 maps to February 28 or 29 and then March 31; an original February month-end also stays at month-end. The final partial interval earns interest through the deadline even if it contains no deposit.
This is a constant-rate projection, not a promise of an account’s actual interest posting, future yield or purchasing power. Rates may change. The main calculator excludes withdrawals, fees and taxes. Funding searches stop at 100 years and show when a target was not reached within that horizon.
